Projects
The combination of an experienced & well established project management systems have enabled us to succeed and grow in a competitive environment. ABI delivers a sophisticated and successful projects both large and small industries, refineries, petrochemical plant, pelletizing plant, aluminum smelter plant & transportation sectors.
ABI first priority & commitment to our clients “To-do what so ever it takes to execute the works with safely, quality, exacting specifications, on time and within budget”.
SURVEY AND CRACK MONITORING
SURVEY AND CRACK MONITORING OF WET STRUCTURES
Category
Survey and Crack monitoring
Client
SIPC (SOHAR INDUSTRIAL PORT COMPANY)
Completed Date
2012 to date
Location
Sohar Industrial Port Area
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
CONSTRUCTION FABRICATION
FABRICATION & ERECTION OF FIRE WATER
Category
Construction, Management
Client
Orpic (Sohar Refinery Company)
Completed Date
2012
Location
Sohar Refinery (Utility Area)
Fabrication & Erection of Fire Water Pipeline Work for Site Integration Project at Sohar Refinery Utility Area
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
TANK PAD FOUNDATION (CIVIL WORKS)
TANK PAD FOUNDATION (CIVIL WORKS)
Category
Construction, Management
Client
L&T Electromech LLC
Completed Date
2010
Location
(Sohar Refinery Area
Entire earthwork for Tank Pad Foundations for the civil works of additional storage tanks at ORPC Sohar site
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
CONSTRUCTION OF AL HAMBAR-6 PUMP
CONSTRUCTION OF AL HAMBAR-6 PUMP STATION & WAQAIBA
Category
Construction, Management
Client
SOHAR MUNICIPALITY
Completed Date
2010
Location
Sohar (Al Hambar & Waqaibah)
Construction of Al Hambar-6 Pump Station & Waqaibah-6 Lift Station.
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
EPC CONTRACT FOR THE CONSTRUCTION OF WORKSHOP
EPC CONTRACT WAREHOUSE & FIRE STATION BUILDING
Category
Construction, Management
Client
ORPIC (AROMATICS OMAN LLC)
Completed Date
2010
Location
Aromatics Plant (Maintenance Area)
1. Construction of Workshop Building (90x49m)
2. Construction of Warehouse Building (90x39m) 3. Construction of Fire Station Building (40x20m) 4. Storage Yard Interlock & Fence (90x33m)
5. Fire Water, Plant Air, Portable Water, Instrument Air & Sewage Water piping for workshop, warehouse & fire station buildings & termination with plant piping.
6. HVAC for all three buildings
7. PAGING and IT Facilities & configuration with plant Paging & IT system
8. Fire Detection System Installation & configuration with Plant Fire Detection system
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
CONSTRUCTION OF ROLLING MACHINE FOUNDATION
CONSTRUCTION OF ROLLING MACHINE FOUNDATION
Category
Construction, Management
Client
L&T HEAVY ENGINEERING
Completed Date
2010
Location
Sohar Industrial Port Area
Construction of Foundation and related civil works for Rolling Machine in HFS-1 at L&T Heavy Engineering Workshop
The languages only differ in their grammar, their pronu nciation and their most common words. pronunciation and more common words. If several languages coalesce. nciation and their most common words. pronunciation and more common words.
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
CONSTRUCTION OF OMANI GERMAN BLOCK FACTORY
CONSTRUCTION OF OMANI GERMAN BLOCK FACTORY
Category
Construction, Management
Client
Omani German Block Factory
Completed Date
2012
Location
Sohar Industrial Area
Scope of work
- Construction of Storage Yard around 20,000 Sq.m (2011)
- Construction of Main Office Building around 600 Sq.m (2011)
- Construction of Recreation Building around 320 Sq.m (2011)
- Construction of Recreation Building around 320 Sq.m (2011)
- Construction of Guard Room and Main Entrance Gate (2011)
- Electromechanical works for the AAC block factory (2012)
- Utility Piping works (CS & SS Pipelines) for the AAC block factory (2012)
- Construction of Dry Mortar Plant including silo’s foundations for the AAC block factory (2012)
Pronunciation and more common words. If several languages the coalesce. over the years, sometimes by accident, sometimes on purpose. Over the years, sometimes by purpose.
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
CONSTRUCTION OF NEW WORKSHOP AND OFFICES FOR MOBILIFT
CONSTRUCTION OF NEW WORKSHOP AND OFFICES FOR MOBILIFT
Category
Construction, Management
Client
M/S. MOBILIFT & PARTNERS LLC
Completed Date
2010
Location
Sohar Industrial Area
Construction of new Workshop and Offices for Mobilft at Sohar Industrial Free Zone
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
ERECTION, TESTING & COMMISSIONING OF PIPING WORK
ERECTION, TESTING & COMMISSIONING OF PIPING WORK
Category
Construction, Management
Client
VALE OMAN PELLETIZING COMPANY
Completed Date
2011
Location
Vale Pelletizing Plant to Vale Jetty Area
Erection, Testing & Commissioning of piping work from Vale Pelletizing Plant to Vale Jetty (Almost 12500 m) total running length with 16,000 dia inches piping
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
PARKING BUILDING FOR AMBULANCE AND FIRE TRUCKS
PARKING BUILDING FOR AMBULANCE AND FIRE TRUCKS
Category
Construction, Management
Client
SA (SOHAR ALUMINIUM COMPANY)
Completed Date
2012
Location
Sohar Industrial Free Zone
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
CONSTRUCTION OF TRAINING CENTRE EXTENSION PHASE-4
CONSTRUCTION OF TRAINING CENTRE EXTENSION PHASE-4
Category
Construction of Training Centre Extension
Client
SA (Sohar Aluminium Company)
Completed Date
2012
Location
Sohar Aluminium (Sohar Industrial Free Zone Area)
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
Civil Works for Iron Ore Emergency Conveyor
Civil Works for Iron Ore Emergency Conveyor
Category
VALE OMAN PELLETIZING COMPANY
Client
VALE OMAN PELLETIZING COMPANY
Completed Date
2012
Location
Vale Pelletizing Plant
Concrete Floor, Piling for Emergency Conveyor & Land Development Works for Iron Ore Emergency Conveyor at VALE Oman Pelletizing Plant
The languages only differ in their grammar, their pronu nciation and their most common words. pronunciation and more common words. If several languages coalesce. nciation and their most common words. pronunciation and more common words.
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
DESIGN, FABRICATION, SUPPLY AND INSTALLATION OF COVERS FOR WWTP TANK COVERS
INSTALLATION OF COVERS FOR WWTP TANK COVERS
Category
Design, Fabrication
Client
ORPIC (SOHAR REFINERY COMPANY)
Completed Date
2012
Location
Sohar Refinery (WWTP Plant Area)
Al-Saqr Fiber Glass Factory LLC (Sharjah, UAE)
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
SA NEW MAIN ENTRANCE GATEWAY PROJECT
SA NEW MAIN ENTRANCE GATEWAY PROJECT
Category
Construction, Management
Client
SA (SOHAR ALUMINIUM COMPANY)
Completed Date
2012
Location
Sohar Industrial Free Zone
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
PROCUREMENT & CONSTRUCTION OF BLAST PROOF OPERATOR
PROCUREMENT & CONSTRUCTION OF BLAST PROOF OPERATOR
Category
Procurement & Construction of Blast Proof Operator at Sohar Refinery Plant
Client
Orpic
Started Date
2012
Location
Sohar Industrial Port (Sohar Refinery Plant Area)
Construction of Blast Proof Operator Shelters 1. Construction of Operator Shelter Type 2 (Single ) Area 100 2. Construction of Operator Shelter Type 1 (Double ) Area 300/500 3. Construction of Operator Shelter Type 2 (Double ) Area 400 4. Construction of Operator Shelter Type 2 (Single ) WWTP Area 5. Construction of Locker Room
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
ANNUAL WIND FENCE MAINTENANCE CONTRACT FOR THE CLEANING OF WIND FENCES AND TRANSFER TOWERS
ANNUAL WIND FENCE MAINTENANCE CONTRACT FOR THE CLEANING OF WIND FENCES AND TRANSFER TOWERS
Category
Cleaning & Maintenance of Storage yard
Client
VALE OMAN PELLETIZING COMPANY
Completed Date
2012
Location
Vale Pelletizing Plant Sohar Industrial Port Area
Cleaning & Maintenance of Storage yard & transfer towers wind fences where ever damages. – Cleaning & Maintenance of Approx. 4000m long, 25m high Wind Fence. – Cleaning & Maintenance of 16 No\’s Transfer Towers in Plant & Storage Yard Area
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
LOGISTICS SERVICES FOR BENTONITE & GRINDING MEDIA
LOGISTICS SERVICES FOR BENTONITE & GRINDING MEDIA
Category
Logistics Services
Client
VALE OMAN PELLETIZING COMPANY
Completed Date
2012 to
Location
Vale Pelletizing Plant
Shifting of Containers shipment from OICT (Oman International Container Terminal) to ABI warehouse & store the shipment material in warehouse at designated warehouse/yard. Supply of Bentonite & Grinding media on daily basis to VALE from ABI warehouse as per plant production requirements.
The languages only differ in their grammar, their pronu nciation and their most common words. pronunciation and more common words. If several languages coalesce. nciation and their most common words. pronunciation and more common words.
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000
CONSTRUCTION OF SAFETY ENCLOSURE ROOMS
CONSTRUCTION OF SAFETY ENCLOSURE ROOMS
Category
Construction, Management
Client
VALE OMAN PELLETIZING COMPANY
Completed Date
2012 to
Location
Vale Pelletizing Plant Sohar Industrial Port Area
Construction of Safety Enclosure Rooms at 20m height near Line A & Line B of Travelling Grate System. – Design, Procurement, Fabrication & Erection of Steel pre-engineered structure covered with 100mm Thick Insulated sandwich pannels. – Covering of 100mm Thick sandwich pannels with 3mm thick M.S sheet from all around to protect insulation pannels.
The languages only differ in their grammar, their pronu nciation and their most common words. pronunciation and more common words. If several languages coalesce. nciation and their most common words. pronunciation and more common words.
- client: Dr. Devis
- Location: USA
- Surface Area: 75,020 m
- Architect: Alex Hales
- Year Of Complited: 2017
- Project Value: $950000